 [     Business case listing ](/resources/case-studies "  Business case listing")



 

 

 

A growing Abu Dhabi community required **additional wastewater treatment capacity and a reliable supply of high-quality recycled water**. The existing plant also needed to meet Abu Dhabi’s recycled-water quality requirements while handling increased flows, all while being upgraded on a live site without disrupting services.

- **Plant upgraded** with Veolia ZeeWeed® MBR technology.
- **100% recycled water** available for non-potable reuse.
- **Up to 15% lower energy footprint.**
- **215 tonnes CO₂/year avoided.**











 



 

 

 



 [PDF

  Plant Upgrade in Abu Dhabi  (207.13 KB)  

    ](/sites/g/files/dvc3051/files/document/2026/09/Plant%20Upgrade%20in%20Abu%20Dhabi.pdf)